TRB Pubsindex
Text Size:

Mark: All | None | Show

Your Search
2010
One-Weekend Job: Rapid Removal and Replacement of 4500 South Bridge in Salt Lake City, Utah

Transportation Research Record: Journal of the Transportation Research Board, Issue 2200, pp 12-16

Actions: Preview Abstract | View Full Document

2010
Instrumentation Plan for Monitoring the New I-10 Twin Span Bridge

Transportation Research Board 89th Annual Meeting, 9p

Actions: Preview Abstract

2010
Distributed Fiber-Optic Sensing and Integrity Monitoring

Transportation Research Record: Journal of the Transportation Research Board, Issue 2150, pp 96-102

Actions: Preview Abstract | View Full Document

2010
Field Testing and Performance Evaluation of Through-Plate Girder Railway Bridge

Transportation Research Record: Journal of the Transportation Research Board, Issue 2172, pp 132-141

Actions: Preview Abstract | View Full Document

2009
Maintenance and Management of the Infrastructure

Transportation Research Record: Journal of the Transportation Research Board, Issue 2108, 134p

Actions: Preview Abstract

2009
Rehabilitation of Timber Railroad Bridges with FRP Composites

Transportation Research Board 88th Annual Meeting, 19p

Actions: Preview Abstract

2009
Low-Cost Ultrasonic Technology for Bridge Pile Inspection

Transportation Research Board 88th Annual Meeting, 12p

Actions: Preview Abstract

2009
Overview and Comparison of Nationwide Underwater Bridge Inspection Practices

Transportation Research Record: Journal of the Transportation Research Board, Issue 2108, pp 97-106

Actions: Preview Abstract | View Full Document

2009
Retrofit Design Details for Deck Joint Elimination over Abutments

Transportation Research Board 88th Annual Meeting, 17p

Actions: Preview Abstract

2009
2008
Element-to-Component Translation of Bridge Condition Ratings

Transportation Research Board 87th Annual Meeting, 25p

Actions: Preview Abstract

2008
Life-Cycle Cost Analysis Algorithm for Bridges: Comprehensive Approach

Transportation Research Board 87th Annual Meeting, 20p

Actions: Preview Abstract

2008
Fatigue Cracks of Welds and Their Repair in Steel Spans of Railroad Bridges

Transportation Research Board 87th Annual Meeting, 13p

Actions: Preview Abstract

2007
2007
How to Build a 700-ft, $20 Million Concrete Bridge in One Year

Transportation Research Board 86th Annual Meeting, 10p

Actions: Preview Abstract

2007
Bridge Substructure Monitoring Using Live Load Induced Vibration

Transportation Research Board 86th Annual Meeting, 13p

Actions: Preview Abstract

2007
Alternative Reinforcing Details in Dapped Ends of Precast Concrete Bridge Girders: Experimental Investigation

Transportation Research Record: Journal of the Transportation Research Board, Issue 2028, pp 111-121

Actions: Preview Abstract | View Full Document

2007
Load and Resistance Factor Design of Integral Bent Caps

Transportation Research Record: Journal of the Transportation Research Board, Issue 2028, pp 96-102

Actions: Preview Abstract | View Full Document

2007
Building Bridges Faster, Smarter, and Better: Case Studies and Lessons Learned

Transportation Research Board 86th Annual Meeting, 14p

Actions: Preview Abstract

2006
2006
Seismic Performance of Reinforced Concrete Bridge Substructure Encased in Fiber Composite Tubes

Transportation Research Record: Journal of the Transportation Research Board, Issue 1976, pp 197-206

Actions: Preview Abstract | View Full Document

to

Use YYYY or YYYYMM format

Modify | New Search | History