TRB Pubsindex

Mark: All | None | Show

Your Search
2008
Analysis of Steel Girder Bridges: New Challenges

Transportation Research Record: Journal of the Transportation Research Board, Issue 2050, pp 67-77

Actions: Preview Abstract | View Full Document

2008
Reliability of Movable Bridge by Means of Field-Calibrated Model

Transportation Research Board 87th Annual Meeting, 16p

Actions: Preview Abstract

2008
Integrated Monitoring System for Carbon Composite Strands in Cable-Stayed Bridge, Penobscot Narrows, Maine

Transportation Research Record: Journal of the Transportation Research Board, Issue 2050, pp 177-186

Actions: Preview Abstract | View Full Document

2008
Advancements of New Narrows Suspension Bridge Design in Tacoma, Washington

Transportation Research Record: Journal of the Transportation Research Board, Issue 2050, pp 59-66

Actions: Preview Abstract | View Full Document

2008
Fatigue Cracks of Welds and Their Repair in Steel Spans of Railroad Bridges

Transportation Research Board 87th Annual Meeting, 13p

Actions: Preview Abstract

2008
Cold Curving Steel Bridge Girders

Transportation Research Record: Journal of the Transportation Research Board, Issue 2081, pp 165-175

Actions: Preview Abstract | View Full Document

2007
Reaction Distribution in Highly Skewed Continuous Steel Girder Bridge: Testing and Analysis

Transportation Research Record: Journal of the Transportation Research Board, Issue 2028, pp 163-170

Actions: Preview Abstract | View Full Document

2007
Effects of Multiple Damage–Heat Straightening Repairs on Steel Beams

Transportation Research Record: Journal of the Transportation Research Board, Issue 2028, pp 67-77

Actions: Preview Abstract | View Full Document

2007
Design of Structures 2007

Transportation Research Record: Journal of the Transportation Research Board, Issue 2028, 247p

Actions: Preview Abstract

2007
Best Practices for the Rehabilitation and Moving of Historic Metal Truss Bridges

Transportation Research Record: Journal of the Transportation Research Board, Issue 1991, pp 71-77

Actions: Preview Abstract | View Full Document

2007
Rockfill Embankment Settlement: Sugarloaf Mountain Bridge Abutment and Hoover Dam Bypass (US-93)

Transportation Research Record: Journal of the Transportation Research Board, Issue 2016, pp 3-12

Actions: Preview Abstract | View Full Document

2007
Acoustic Emission Monitoring of Field Bridges in Louisiana

Transportation Research Board 86th Annual Meeting, 22p

Actions: Preview Abstract

2007
Seismic Retrofit Assessment with Multilevel Performance Objectives

Transportation Research Board 86th Annual Meeting, 13p

Actions: Preview Abstract

2007
Suspension Trail Bridge Using Sustainable Materials

Transportation Research Board 86th Annual Meeting, 10p

Actions: Preview Abstract

2007
How to Build a 700-ft, $20 Million Concrete Bridge in One Year

Transportation Research Board 86th Annual Meeting, 10p

Actions: Preview Abstract

2007
Practical Method for Analyzing Curved Steel I-Girder Bridges

Transportation Research Board 86th Annual Meeting, 17p

Actions: Preview Abstract

2007
Development of Live Load Distribution Factor Equation for Girder Bridges

Transportation Research Record: Journal of the Transportation Research Board, Issue 2028, pp 9-18

Actions: Preview Abstract | View Full Document

2007
Design for Launching Great Bear River Bridge near the Arctic Circle

Transportation Research Board 86th Annual Meeting, 11p

Actions: Preview Abstract

to

Use YYYY or YYYYMM format

Modify | New Search | History