|
Title: ESTIMATING PERSONNEL REQUIREMENTS FOR HIGHWAY DESIGN
Accession Number: 00200703
Record Type: Component
Abstract: A RATIONAL METHOD OF ESTIMATING PERSONNEL REQUIREMENTS AND ORGANIZING A ROAD DESIGN OFFICE TO MEET A GIVEN SCHEDULE OF PROPOSED HIGHWAY CONSTRUCTION IS GIVEN. A "POINT EVALUATION SYSTEM" BASED ON PRODUCTION OF THE ONTARIO DEPARTMENT OF HIGHWAYS ROAD DESIGN OFFICE, FROM 1955 TO 1959 IS DISCUSSED. THIS SYSTEM ALLOWS THE PREDETERMINATION OF THE REQUIRED RATE OF PRODUCTION, AND, CORRESPONDINGLY, THE NUMBER OF STAFF AT VARIOUS LEVELS FOR ANY GIVEN CONSTRUCTION SCHEDULE. IT ALSO ADVISES THE DESIGN ENGINEER OF WORK BEYOND THE CAPACITY OF HIS STAFF, AND WHICH MUST BE DONE BY CONSULTANTS OR OTHER AGENCIES SO THAT THE SCHEDULE MAY BE KEPT. EXPERIENCE WITH THIS SYSTEM OVER THE PAST TWO YEARS, WILL REQUIRE MODIFICATIONS. THIS METHOD OF EVALUATING THE WORK AND ESTIMATING PERSONNEL REQUIREMENTS IS EXTREMELY USEFUL TO THE DESIGN ADMINISTRATOR AND HAS EXCELLENT POTENTIAL FOR APPLICATION TO OTHER PHASES OF HIGHWAY ENGINEERING WORK. /AUTHOR/
Supplemental Notes: No 296, pp 1-16, 11 FIG, 3 TAB. Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the Transportation Research Board of the National Academy of Sciences. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved.
Monograph Title: Monograph Accession #: 01410679
Authors: Mcmillan, H DFarren, D WGater, APagination: 16p
Publication Date: 1961
Serial: Conference:
40th Annual Meeting of the Highway Research Board
Location:
Washington DC, United States Media Type: Digital/other
TRT Terms: Uncontrolled Terms: Subject Areas: Administration and Management; Highways; Society
Files: TRIS, TRB
Created Date: Jul 29 1994 12:00AM
More Articles from this Serial Issue: |