Title: Optimization Methodology of Project Construction Scheduling for Intermodal Terminal Planning Problems
Accession Number: 01154974
Record Type: Component
Record URL: Availability: Transportation Research Board Business Office 500 Fifth Street, NW Find a library where document is available Abstract: The goal of this paper is to present a methodology to optimize project construction scheduling for intermodal terminal planning problems. To accomplish that goal, an algorithm is developed to optimize dynamically the prioritization for all planned intermodal terminals. Optimized project construction scheduling can mitigate traffic congestion and decrease the total travel time. In addition, it is important to make full use of the intermodal terminals to achieve the maximum benefit with a limited financing plan. Essentially, project construction scheduling for intermodal terminals is intended to determine the optimal sequence of intermodal terminal project construction. This paper presents four concepts: location indicator, volume indicator, node indicator, and general indicator. The general indicator is equal to the weighted sum of the location indicator, volume indicator, and node indicator, and it is the key factor in optimizing project construction scheduling. A case study in Beijing is provided to demonstrate the practicability and feasibility of the proposed method.
Monograph Title: Monograph Accession #: 01323856
Report/Paper Numbers: 10-2119
Language: English
Authors: Wang, ZhenbaoChen, YanyanWang, HaizhongKang, HaoYu, YuePagination: pp 189-196
Publication Date: 2010
ISBN: 9780309160469
Media Type: Print
Features: Figures
(2)
; Maps
(1)
; References
(15)
; Tables
(9)
TRT Terms: Geographic Terms: Subject Areas: Planning and Forecasting; Public Transportation; Terminals and Facilities; I72: Traffic and Transport Planning
Files: TRIS, TRB, ATRI
Created Date: Jan 25 2010 10:58AM
More Articles from this Serial Issue:
|