|
Title: Sketch Planning Assessment of Managed-Lane Options for I-5 Freeway Corridor Master Plan
Accession Number: 01127284
Record Type: Component
Availability: Transportation Research Board Business Office 500 Fifth Street, NW Abstract: The Washington State Department of Transportation(WSDOT) has adopted a policy to consider a managed-lanes approach for all new lanes that are added to the state highway system. DKS Associates used sketch-planning methods to evaluate the feasibility of three methods for managed lanes for new lanes that might be added to I-5 in Whatcom County. The options considered were high occupancy vehicle (HOV) lanes, high occupancy tool (HOT) lanes and truck-only lanes. The analysis of these options was conducted using simple sketch-planning methods designed to assess whether the options warranted further consideration in the master planning process. This paper presents the approach used, the data that supported the analysis and the results of the analysis. The results reported in the paper demonstrate that a quick-run-around approach can be effective in screening managed-lane options without extensive modeling or time-consuming analyses.
Monograph Title: Monograph Accession #: 01120148
Report/Paper Numbers: 09-3801
Language: English
Corporate Authors: Transportation Research Board 500 Fifth Street, NW Authors: Loudon, William RPagination: 13p
Publication Date: 2009
Conference:
Transportation Research Board 88th Annual Meeting
Location:
Washington DC, United States Media Type: Digital/other
Features: Maps
(1)
; References
(12)
; Tables
(2)
TRT Terms: Subject Areas: Highways; Planning and Forecasting; I72: Traffic and Transport Planning
Source Data: Transportation Research Board Annual Meeting 2009 Paper #09-3801
Files: TRIS, TRB
Created Date: Jan 30 2009 8:13PM
|