This paper discusses the design technique used to determine an economic pavement construction for a 115-mile (185-km) road over lateritic clays. The design called for using existing top 6 in. (15 cm) of existing road base as the subbase of the new road.
Supplemental Notes:
Proceedings of a work shop held June 16-19, 1975, in Boise, Idaho by the Transportation Research Board.