Title: EARTHWORK CONSTRUCTION
Accession Number: 00496765
Record Type: Component
Availability: Find a library where document is available Abstract: This chapter, Chapter 4 of the "Guide to Earthwork Construction," is intended to acquaint field engineers and inspectors with good earthwork construction procedures and the reasons for developing them. Topics covered include preliminary work, clearing and grubbing, slope ditches, excavation, rock excavation, embankment foundations, embankments, compaction, cold weather construction, compaction equipment, compaction in confined areas, inspection, structure backfill, proof rolling, transitions, benching, and slope protection.
Supplemental Notes: Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the Transportation Research Board of the National Academy of Sciences. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved.
Corporate Authors: Transportation Research Board 500 Fifth Street, NW Authors: Waidelich, W CPagination: p. 25-48
Publication Date: 1990
Serial: ISBN: 0-309-04957-1
Media Type: Digital/other
Features: Figures
(2)
; References
TRT Terms: Uncontrolled Terms: Old TRIS Terms: Subject Areas: Construction; Geotechnology; Highways; I42: Soil Mechanics; I51: Earthworks and Soil Drainage
Files: TRIS, TRB
Created Date: Aug 31 1990 12:00AM
More Articles from this Serial Issue:
|