|
Title: MATURITY METHOD APPLIED TO HIGHWAY CONSTRUCTION
Accession Number: 00985974
Record Type: Component
Record URL: Availability: Transportation Research Board Business Office 500 Fifth Street, NW Find a library where document is available Abstract: The use of the maturity method in concrete pavement construction is becoming popular for state departments of transportation (DOTs). An application of the technique is the opening of pavements to traffic. Research was done by the Kentucky DOT to identify the viability of this method. The application of the maturity technique to three fast-track concrete pavement repair projects is outlined. The chosen equipment, preferred instrumentation methodology, and lessons learned by department personnel are summarized. The results obtained to date show that the maturity approach can be used effectively in quality control and opening to traffic. However, close attention should be given to the limitations of the technique.
Supplemental Notes: This paper appears in Transportation Research Record No. 1900, Construction 2004.
Monograph Title: Monograph Accession #: 00985965
Language: English
Corporate Authors: Transportation Research Board 500 Fifth Street, NW Authors: Mohsen, J PRoach, B LKessinger, D TPagination: p. 79-85
Publication Date: 2004
Serial: ISBN: 0309094941
Features: Figures
(7)
; References
(4)
; Tables
(1)
TRT Terms: Uncontrolled Terms: Subject Areas: Construction; Highways; I52: Construction of Pavements and Surfacings
Files: TRIS, TRB, ATRI
Created Date: Feb 17 2005 12:00AM
More Articles from this Serial Issue:
|