TRB Pubsindex
Text Size:

Title:

Keys To Repairing And Restarting Stalled Roadway Projects

Accession Number:

01045208

Record Type:

Component

Availability:

Transportation Research Board Business Office

500 Fifth Street, NW
Washington, DC 20001 United States

Abstract:

Techniques, examples and observations from projects that were successfully brought forward in the face of public controversy and redirected into positive forces will be discussed. These projects were “repaired and restarted” by the communities that had, in some cases, been waiting for years and years to see the project completed. A “lessons learned” approach will be used including suggestions for local leaders to apply in their own communities. One of the projects, the largest single public improvement in a city's history, was locally funded at $5,500,000 in a city of 10,000 population. All of the others utilized a combination of federal and local dollars. This presentation and paper will use insights gained from projects in cities with populations of 3,500; 5,000; 10,000; 35,000 and 120,000. In each case, the highlighted projects were mired in confusion, wracked by dissension and/or stymied by lack of community support. Three of the projects are now completed. Two are waiting for federal-aid funding. These roadway projects range in size from $1,600,000 to over $5,500,000 each. They are all in prominent, highly visible locations within the communities and have sensitive and/or demanding adjacent land uses. These land uses include railroads, large industries, elementary and high schools, historic properties, dense commercial development with multiple driveways, a golf course, a high-rise hotel, fast-food restaurants, convenience stores, and a mega-grocery store, among others. Some of the other characteristics included a single-lane, under-height railroad bridge over an arterial roadway, deficient drainage and storm sewer systems, major utility relocations, and property owners/community leaders fed up with back-to-back studies with no results. All of the cases had one or more previous studies or attempted efforts to develop a workable roadway plan. The new design team assembled for these projects had to deal with the baggage created in the previous attempts as well as the challenge of creating a consensus plan under intense scrutiny.

Monograph Accession #:

01045220

Language:

English

Corporate Authors:

Transportation Research Board

500 Fifth Street, NW
Washington, DC 20001 United States

Authors:

Cary, William E

Pagination:

12p

Publication Date:

2002

Conference:

Eighth National Conference on Transportation Planning for Small and Medium-Sized Communities

Location: Cincinnatti OH, United States
Date: 2002-9-18 to 2002-9-20
Sponsors: Transportation Research Board

Media Type:

CD-ROM

Subject Areas:

Administration and Management; Construction; Education and Training; Highways; History; Hydraulics and Hydrology; Planning and Forecasting; Railroads; Terminals and Facilities; I52: Construction of Pavements and Surfacings; I72: Traffic and Transport Planning

Files:

TRIS, TRB

Created Date:

Mar 13 2007 12:46PM

More Records from this Conference: