TRB Pubsindex
Text Size:

Title:

MULTIPERIOD HIGHWAY IMPROVEMENT AND CONSTRUCTION SCHEDULING: MODEL DEVELOPMENT AND APPLICATION

Accession Number:

00755118

Record Type:

Component

Availability:

Transportation Research Board Business Office

500 Fifth Street, NW
Washington, DC 20001 United States

Find a library where document is available


Order URL: http://worldcat.org/isbn/0309064627

Abstract:

A methodology is presented that emulates the transportation improvement planning process using mathematical optimization techniques. The scheduling problem is formulated as a mixed integer linear program (MILP) and can be considered as a multiperiod network design problem. The three primary model components are discussed: (a) the input module in which the network, traffic demand, and pool of potential projects are identified over the planning horizon; (b) the benefits estimation module using network travel time as the benefit criterion; and (c) the schedule builder, an MILP that attempts to maximize the total benefits subject to annual resources and project precedence constraints. The proposed method is applied in a case-study context to the Lisbon metropolitan region's network, a portion of Portugal's highway network, and the results are discussed.

Supplemental Notes:

This paper appears in Transportation Research Record No. 1617, Land Use and Transportation Planning and Programming Applications.

Language:

English

Corporate Authors:

Transportation Research Board

500 Fifth Street, NW
Washington, DC 20001 United States

Authors:

ElDessouki, W
Rouphail, N
Beja, M
Ranjithan, S R

Pagination:

p. 96-104

Publication Date:

1998

Serial:

Transportation Research Record

Issue Number: 1617
Publisher: Transportation Research Board
ISSN: 0361-1981

ISBN:

0309064627

Features:

Figures (8) ; References (16) ; Tables (2)

Uncontrolled Terms:

Geographic Terms:

Old TRIS Terms:

Subject Areas:

Highways; Planning and Forecasting; I72: Traffic and Transport Planning

Files:

TRIS, TRB, ATRI

Created Date:

Oct 23 1998 12:00AM

More Articles from this Serial Issue: