TRB Pubsindex
Text Size:

Title:

COST OF SPEED: ANALYSIS OF CAPITAL COST ESTIMATES FOR HIGH-SPEED GROUND TRANSPORTATION SYSTEMS

Accession Number:

00740697

Record Type:

Component

Availability:

Transportation Research Board Business Office

500 Fifth Street, NW
Washington, DC 20001 United States

Find a library where document is available


Order URL: http://worldcat.org/isbn/0309061555

Abstract:

The Intermodal Surface Transportation Efficiency Act of 1991 required the U.S. Department of Transportation to evaluate the commercial feasibility of high-speed ground transportation--a family of technologies ranging from incremental rail improvements to high-speed rail and magnetic levitation (Maglev) systems--in selected urban corridors. The evaluation involved estimating travel times, capital costs, operation and maintenance costs, and ridership for proposed service frequencies and then computing the potential return on investment from fares and other potential revenues. The results are documented in a U.S. Department of Transportation report generally referred to as the commercial feasibility study (CFS). Two elements of the CFS are addressed here: travel times and capital costs in four illustrative corridors--Chicago to St. Louis; Los Angeles to San Francisco; Eugene, Oregon, to Vancouver, B.C., Canada; and Miami to Tampa via Orlando. Analysis of the results reveals common cost trends: for average speeds up to about 200 km/hr (125 mph), the initial investment required is generally in the range of $1.6 to $3 million per route-kilometer ($2.6 to $4.8 million per route-mile). Above this speed regime (which varies by corridor), the initial investment increases steadily with speed, generally reaching $10 to $12 million per route-km ($16 to $19 million per route-mi) for very-high-speed rail systems and from $14 to $19 million per route-km ($23 to $31 million per route-mi) for Maglev systems. Analysis of the capital cost estimates reveals that despite the wide range of initial costs for the high-speed options, the cost per minute of trip time saved is remarkably consistent in corridors of similar length and with similar terrains. Cost-effectiveness plots are provided, allowing the reader to compare the performance of each of the four corridors in terms of trip time savings and cost per route-kilometer.

Supplemental Notes:

This paper appears in Transportation Research Record No. 1584, Railroad Research Topics: Costs of High-Speed Rail, Communications-Based Control, and Track Research.

Language:

English

Corporate Authors:

Transportation Research Board

500 Fifth Street, NW
Washington, DC 20001 United States

Authors:

Harrison, J A

Pagination:

p. 17-21

Publication Date:

1997

Serial:

Transportation Research Record

Issue Number: 1584
Publisher: Transportation Research Board
ISSN: 0361-1981

ISBN:

0309061555

Features:

Figures (4) ; References (6) ; Tables (1)

Uncontrolled Terms:

Old TRIS Terms:

Subject Areas:

Economics; Highways; Public Transportation; Railroads; Society

Files:

TRIS, TRB

Created Date:

Sep 17 1997 12:00AM

More Articles from this Serial Issue: