Title: DEVELOPMENT AND IMPLEMENTATION OF A PAVEMENT MANAGEMENT SYSTEM FOR MINNESOTA
Accession Number: 00621648
Record Type: Component
Availability: Find a library where document is available Abstract: The Minnesota Department of Transportation (Mn/DOT) began the planning for its network level pavement management system (PMS) in the early 1980s, with actual development and implementation in the mid to late 1980s. Staging, preimplementation planning, and strong organizational support were major factors in the success of the PMS. A background summary of the PMS development is provided and the requirements for preimplementation planning are identified. A system overview is presented of the overall logic and the major products. The PMS is comprehensive and incorporates a number of programs for data management functions, user interface, analysis, and reporting. It operates on a personal computer workstation and is linked to the Transportation Information System on the Mn/DOT's mainframe computer. The PMS is flexible in the options provided to the user and in the range of detail for summarized graphical and tabular reporting functions. Two major subsystems are incorporated in the PMS: (a) Status and Needs Subsystem, and (b) Rehabilitation Optimization Subsystem. The former is capable of displaying the present status of each segment of the network, or the network as a whole, in terms of present serviceability rating, structural adequacy rating, surface rating, and a composite pavement quality index. The latter is able to consider a large number of alternatives. It calculates capital, maintenance (optionally), and user delay (optionally) costs for each combination of alternative segment and possible implementation year (i.e., projects are considered in advance, and deferred, from the needs year). The outputs range from detailed calculations of optimized effectiveness for individual segments to summary reports of changes in an average performance index parameter for the network for different budget levels. Minnesota has a comprehensive, flexible PMS in place and operational, tailored to its requirements. Among the key reasons for the successful development and implementation were careful preimplementation planning; strong support throughout the department including senior management; a sound technical basis for the system in terms of the data base, models, programs, and reporting functions; and a commitment by those responsible for its operation and use.
Supplemental Notes: This paper appears in Transportation Research Record No. 1311, Pavement Management: Data Collection, Analysis, and Storage 1991. Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the Transportation Research Board of the National Academy of Sciences. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved
Monograph Title: Pavement management: data collection, analysis, and storage, 1991 Monograph Accession #: 01407160
Authors: Hill, LorenCheetham, AlanHaas, RalphPagination: p. 230-241
Publication Date: 1991
Serial: ISBN: 0309051509
Features: Figures
(10)
; References
(4)
; Tables
(5)
Geographic Terms: Old TRIS Terms: Subject Areas: Highways; Pavements; Planning and Forecasting; Research; I23: Properties of Road Surfaces
Files: TRIS, TRB, ATRI
Created Date: Apr 30 1992 12:00AM