Title: REPORT ON PAVEMENT RESEARCH PROJECT IN OHIO
Accession Number: 00206969
Record Type: Component
Abstract: THIS PROJECT WAS BUILT IN THE SUMMER AND FALL OF 1952 IN AN ATTEMPT TO DETERMINE THE PERFORMANCE OF VARIOUS THICKNESSES OF SUBBASE ON A MAIN TRUCK ROUTE. THE PROJECT IS FOUR MILES LONG, OF 9-IN. UNIFORM THICKNESS, AND IS 24 FT. WIDE. IT IS DIVIDED INTO FOUR SECTIONS, TWO WITH CONTRACTION JOINTS ON 100-FT. CENTERS AND TWO WITH CONTRACTION JOINTS ON 20-FT. CENTERS. THE FOUR SECTIONS ARE DIVIDED INTO SUBSECTIONS USING THE FOLLOWING TYPES OF SUBBASE: (1) CONTROL WITH NO SUBBASE, SUBGRADE IS A KNOWN PUMPING SOIL, (2) OPEN-TEXTURED GRANULAR SUBBASE MATERIAL, 3, 5, AND 8 INCHES THICK, (3) DENSE-GRADED GRANULAR SUBBASE MATERIAL, 3, 5, AND 8 INCHES THICK, (4) CEMENT-MODIFIED SOIL 6 INCHES THICK, WITH CEMENT CONTENTS OF 5, 7, 9, AND 11 PERCENT, AND (5) SOIL-CEMENT MIXTURE 3 AND 5 INCHES THICK. EIGHTEEN 24- HR. TRAFFIC COUNTS MADE SINCE THE PROJECT WAS CONSTRUCTED SHOW THAT THE TEST LANES CARRY APPROXIMATELY 1,844 COMBINATION TRUCKS IN 24 HOURS. MANY OF THESE HAVE AXLE LOADS EXCEEDING 18,000 LB. /AUTHOR/
Supplemental Notes: No 116, pp 57-71, 3 FIG, 18 TAB, 3 REF, 1 APP Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the Transportation Research Board of the National Academy of Sciences. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved.
Monograph Title: Monograph Accession #: 01410517
Authors: Allen, Charles WChilds, L DPagination: 16p
Publication Date: 1956
Serial: Media Type: Digital/other
TRT Terms: Uncontrolled Terms: Old TRIS Terms: Subject Areas: Highways; Pavements; Research
Files: TRIS, TRB
Created Date: Dec 9 1994 12:00AM
More Articles from this Serial Issue: |