TRB Pubsindex
Text Size:

Title:

JACKSON BOULEVARD ANALYSIS OF TRAFFIC OPERATIONS

Accession Number:

00225997

Record Type:

Component

Availability:

Transportation Research Board Business Office

500 Fifth Street, NW
Washington, DC 20001 United States

Abstract:

PENDING COMPLETION OF THE CONGRESS STREET EXPRESSWAY IN 1956, RELIEF FOR THE CONGESTED TRAFFIC FROM CHICAGO'S WEST SIDE INTO THE LOOP IS BEING SOUGHT THROUGH THE BOULEVARD SYSTEM. AN EXTENSIVE ANALYSIS OF TRAFFIC OPERATION ON JACKSON BOULEVARD IS DESCRIBED. BASED ON THIS ANALYSIS, CHANGES IN TRAFFIC OPERATION, PARKING, SIGNING AND SIGNALING WERE RECOMMENDED. THIS MODERNIZATION PROGRAM IS DESCRIBED AND ILLUSTRATED. ALTHOUGH THE ENTIRE PROGRAM HAS NOT BEEN COMPLETED, REVISION OF PARKING ORDINANCES, RE-SIGNING OF THE ENTIRE BOULEVARD, AND INSTALLATION OF LANE MARKERS AND STENCILS HAVE ALREADY HAD A MARKED BENEFICIAL EFFECT. FOR THE FIRST SIX MONTHS OF 1950 TRAFFIC VOLUME INCREASED 18 1/2 PERCENT WHILE THE ACCIDENT RATE INCREASED ONLY 3.3 PERCENT. DURING THE SAME PERIOD, ACCIDENTS THROUGHOUT THE ENTIRE PARK DISTRICT INCREASED 11.9 PERCENT. GREATER VOLUMES OF TRAFFIC ARE BEING OPERATED OVER THIS BOULEVARD WITHOUT ANY MATERIAL INCREASE IN RUNNING TIMES. /AUTHOR/

Supplemental Notes:

Vol 30, pp 297-313, 8 FIG, 14 PHOT. Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the Transportation Research Board of the National Academy of Sciences. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved.

Monograph Accession #:

01490395

Authors:

Fencl, R G

Editors:

Crum, Roy W
Burggraf, Fred
Carey Jr, W N

Publication Date:

1951

Serial:

Highway Research Board Proceedings

Volume: 30
Publisher: Highway Research Board

Media Type:

Digital/other

Subject Areas:

Highways; Operations and Traffic Management

Files:

TRIS, TRB

Created Date:

Jul 25 1971 12:00AM

More Articles from this Serial Issue: