TRB Pubsindex
Text Size:

Title:

FAST-ASSEMBLY BRIDGE OVER THE AEGIDIENTORPLATZ IN HANNOVER

Accession Number:

00243061

Record Type:

Component

Availability:

Find a library where document is available


Order URL: http://worldcat.org/isbn/0309019850

Abstract:

A FAST-ASSEMBLY BRIDGE IS A STRUCTURE THAT CAN BE RAPIDLY PROCURED, QUICKLY ASSEMBLED, AND SUBSEQUENTLY DISASSEMBLED. THE SPECIFIC EXAMPLE WAS BUILT TO RELIEVE CONGESTION AT A MAIN INTERSECTION. CONSTRUCTION WAS COMPLETED IN FIVE WEEKENDS ON A CAREFULLY CONTROLLED SCHEDULE TO MINIMIZE TRAFFIC DISRUPTION. METHODS AND MATERIALS ARE DESCRIBED.

Supplemental Notes:

Presented at the 50th Annual Meeting. Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the Transportation Research Board of the National Academy of Sciences. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved.

Monograph Accession #:

01035807

Authors:

Koger, E

Pagination:

pp 47-54

Publication Date:

1971

Serial:

Highway Research Record

Issue Number: 372
Publisher: Highway Research Board

Conference:

50th Annual Meeting of the Highway Research Board

Location: Washington District of Columbia, United States
Date: 1971-1-18 to 1971-1-22
Sponsors: Highway Research Board. Task Force on Effect of Studded Tires

ISBN:

0309019850

Media Type:

Digital/other

Features:

Figures (7)

Uncontrolled Terms:

Old TRIS Terms:

Subject Areas:

Bridges and other structures; Construction; Highways; Research

Files:

TRIS, TRB, ATRI

Created Date:

Apr 23 1972 12:00AM

More Articles from this Serial Issue: