|
Title: THE LOWRY HILL TUNNEL FREEZE WALL
Accession Number: 00243058
Record Type: Component
Availability: Find a library where document is available Abstract: THE PROBLEM OF EXCAVATING IN FINE SAND, WITHIN 25 FEET OF CHURCH FOOTINGS, WAS SOLVED BY GROUND-FREEZING, RATHER THAN BY USING SHEET PILING OR UNDERPINNINGS. METHODS AND PROBLEMS OF APPLICATION ARE DISCUSSED. COST IS ESTIMATED AT $10,000 LESS THAN UNDERPINNING.
Supplemental Notes: Presented at the 50th Annual Meeting. Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the Transportation Research Board of the National Academy of Sciences. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved.
Monograph Title: Monograph Accession #: 01035807
Authors: Osterby, Norman RPagination: pp 37-41
Publication Date: 1971
Serial: Conference:
50th Annual Meeting of the Highway Research Board
Location:
Washington District of Columbia, United States ISBN: 0309019850
Media Type: Digital/other
Features: Figures
(10)
TRT Terms: Geographic Terms: Old TRIS Terms: Subject Areas: Bridges and other structures; Geotechnology; Highways; Research
Files: TRIS, TRB
Created Date: Apr 23 1972 12:00AM
More Articles from this Serial Issue:
|