TRB Pubsindex
Text Size:

Title:

Advance Preempt with Gate-Down Confirmation: Solution for Preempt Trap
Cover of Advance Preempt with Gate-Down Confirmation: Solution for Preempt Trap

Accession Number:

01049333

Record Type:

Component

Availability:

Transportation Research Board Business Office

500 Fifth Street, NW
Washington, DC 20001 United States
Order URL: http://www.trb.org/Main/Public/Blurbs/156835.aspx

Find a library where document is available


Order URL: http://worldcat.org/isbn/9780309104623

Abstract:

The preempt trap, a safety issue at some traffic signals near railroad grade crossings with advance preempt, can be addressed in several ways if the operating authority is aware of the potential problem. However, some solutions, such as not using advance preemption, result in other problems, including potentially unsafe clearance intervals during preemption. A simple solution, available from railroads under the standards of the American Railway Engineering and Maintenance-of-Way Association, that provides both safe and efficient operation is evaluated. The evaluation demonstrates the potential value of the use of advance preempt with gate-down confirmation.

Monograph Accession #:

01091263

Language:

English

Authors:

Yohe, Jacob Russell
Urbanik II, Thomas

Pagination:

pp 40-49

Publication Date:

2007

Serial:

Transportation Research Record: Journal of the Transportation Research Board

Issue Number: 2035
Publisher: Transportation Research Board
ISSN: 0361-1981

ISBN:

9780309104623

Media Type:

Print

Features:

Figures (16) ; References (7)

Uncontrolled Terms:

Subject Areas:

Highways; Operations and Traffic Management; Railroads; I73: Traffic Control

Files:

TRIS, TRB, ATRI

Created Date:

Feb 8 2007 4:50PM

More Articles from this Serial Issue: