|
Title: Scheduling of Multiple-Yard Crane System with Container Loading Sequence Consideration
Accession Number: 01031459
Record Type: Component
Availability: Transportation Research Board Business Office 500 Fifth Street, NW Abstract: This paper addresses the scheduling problem of multiple yard crane systems in container terminal operations. In this problem, several yard cranes are used to discharge a sequence of containers from one or more container blocks. An integer programming model is developed for the problem formulation. In the model, the work schedules of different yard cranes are decided simultaneously to minimize the total handling time. It is noted that the yard crane routing problem is NP-complete by nature. This research develops a greedy heuristic and a Simulated Annealing algorithm to solve the proposed model. The performance of the two algorithms is illustrated through presented numerical examples.
Monograph Title: Monograph Accession #: 01020180
Report/Paper Numbers: 06-1387
Language: English
Corporate Authors: Transportation Research Board 500 Fifth Street, NW Authors: Lee, Der-HorngMeng, QiangCao, ZhiPagination: 16p
Publication Date: 2006
Conference:
Transportation Research Board 85th Annual Meeting
Location:
Washington DC, United States Media Type: CD-ROM
Features: Figures
(10)
; References
(7)
; Tables
(3)
TRT Terms: Subject Areas: Freight Transportation; Marine Transportation; Terminals and Facilities
Source Data: Transportation Research Board Annual Meeting 2006 Paper #06-1387
Files: BTRIS, TRIS, TRB
Created Date: Mar 3 2006 10:40AM
|