Title: Managing Transportation Megaproject Schedule Risks Using Structural Equation Modeling: A Case Study of Shanghai Hongqiao Integrated Transport Hub in China
Accession Number: 01553805
Record Type: Component
Availability: Transportation Research Board Business Office 500 Fifth Street, NW Abstract: Transportation megaprojects have recently addressed more and more public attentions due to large investment, advanced technologies and long-time construction. Tight schedules, multifunctional scopes, and colossal sizes usually characterize transportation megaprojects as challenging tasks for completion. Aligning with the original timeline could not only guarantee the missions that megaprojects usually hold to complete on time, but also save the public resources and protect civilian benefits. However, due to the long lifecycle and high investments in real practice, considerable uncertainties were added in transportation megaprojects. Schedule overrunning frequently occurred during the planning and construction phases, named the “megaproject paradox”. In order to address these situations, a schedule risk management method was developed in this paper based on the structural equation model. In the proposed method, risk identification, evaluation and response were arranged as a sequence, and the expert elicitation technique was adopted in order to quantify the schedule risk status. To demonstrate the applicability of the proposed model, a megaproject case in China, the Shanghai Hongqiao Integrated Transport Hub (SHITH), was chosen. Information within the expanded risk register was collected including the probability and consequence of risk events, the complexity of risk responsible owners, the reaction time, and the time lasting for risk countermeasures. Final risk control results showed that the method could not only address the schedule risks correlations effectively, but also maintained the simplicity for construction management practices.
Supplemental Notes: This paper was sponsored by TRB committee AFH10 Construction Management. Alternate title: Managing Transportation Megaproject Schedule Risks Using Structural Equation Modeling: Case Study of Shanghai Hongqiao Integrated Transport Hub in China.
Monograph Title: Monograph Accession #: 01550057
Report/Paper Numbers: 15-4660
Language: English
Corporate Authors: Transportation Research Board 500 Fifth Street, NW Authors: Deng, QianliPeng, WeiChen, JianguoShen, LiangfaTang, KeweiPagination: 17p
Publication Date: 2015
Conference:
Transportation Research Board 94th Annual Meeting
Location:
Washington DC, United States Media Type: Digital/other
Features: Figures; Maps; References; Tables
TRT Terms: Geographic Terms: Subject Areas: Administration and Management; Construction; Terminals and Facilities; Transportation (General); I50: Construction and Supervision of Construction
Source Data: Transportation Research Board Annual Meeting 2015 Paper #15-4660
Files: TRIS, TRB, ATRI
Created Date: Dec 30 2014 1:32PM
|