TRB Pubsindex
Text Size:

Title:

Why Choose the New I-35W Mississippi River Bridge?

Accession Number:

01340081

Record Type:

Component

Abstract:

On September 18th 2008, a replacement for the previously collapsed I-35W bridge opened to the public. Consequently, travelers were once again confronted with the opportunity to find better alternatives.The traffic pattern of the Minneapolis road network was likely to readjust, because of the new link addition. However, questions arise about the possible reasons (or components in the route choice process) that are likely to influence travelers crossing the Mississippi, who had to choose among the bridge options, including the new I-35W bridge. Using global position system (GPS) data and web-based survey collected both before and after the replacement bridge opened, a bridge choice model is estimated using weighted-least squares logit. In this way the proportion of I-35W trips can be estimated depending on the assigned values of the explanatory variables, which include: statistical measures of the travel time distribution experienced by the subjects, alternative diversity, and others. The results showed that travel time savings and reliability were the main reasons for choosing the new I-35W bridge.

Monograph Accession #:

01329018

Report/Paper Numbers:

11-3373

Language:

English

Corporate Authors:

Transportation Research Board

500 Fifth Street, NW
Washington, DC 20001 United States

Authors:

Carrion-Maders, Carlos
Levinson, David M

Pagination:

12p

Publication Date:

2011

Conference:

Transportation Research Board 90th Annual Meeting

Location: Washington DC, United States
Date: 2011-1-23 to 2011-1-27
Sponsors: Transportation Research Board

Media Type:

DVD

Features:

Figures; Maps; References (4) ; Tables (5)

Uncontrolled Terms:

Subject Areas:

Highways; Planning and Forecasting; I72: Traffic and Transport Planning

Source Data:

Transportation Research Board Annual Meeting 2011 Paper #11-3373

Files:

TRIS, TRB

Created Date:

Feb 17 2011 6:30PM