TRB Pubsindex
Text Size:

Title:

SOME PRINCIPLES INVOLVED IN BITUMINOUS MACADAM CONSTRUCTION

Accession Number:

00205807

Record Type:

Component

Availability:

Transportation Research Board Business Office

500 Fifth Street, NW
Washington, DC 20001 United States

Abstract:

FUNDAMENTAL PRECAUTIONS FOR SUCCESSFUL BITUMINOUS MACADAM PAVEMENT DESIGN AND CONSTRUCTION ARE DISCUSSED IN THE LIGHT OF FIELD OBSERVATIONS. OF PRIME IMPORTANCE IS THE PREPARATION OF THE SUBBASE UPON WHICH THE BASE COURSE OF CRUSHED STONE IS TO BE PLACED. ANOTHER ESSENTIAL INGREDIENT IN CONSTRUCTION IS THE PLACING OF SUFFICIENT SHOULDER ALONG THE SIDE LINES TO HOLD THE CRUSHED STONE COURSES. THE PENETRATION COURSE OF STONE SHOULD BE UNIFORM IN DEPTH TO ENSURE THE BEST RESULTS. THE BASE COURSE OF CRUSHED STONE SHOULD BBE FILLED WITH SAND OR CRUSHER DUST. STREAKS IN THE PENETRATION COURSE OF STONE SHOULD BE PENETRATED WITH A HAND HOSE AND NOT LEFT FOR THE SEAL COAT TO COVER UP. IN ADDITION TO SKILLFUL ROLLING REQUIRED IN THE CONSTRUCTION OF A GOOD BITUMINOUS MACADAM, IT IS ESSENTIAL THAT THE PAVEMENT SECURE SUFFICIENT ROLLING TO THOROUGHLY COMPACT THE STONE. CONSTANT CARE SHOULD BE TAKEN DURING THE WHOLE CONSTRUCTION PROCESS AND FAULTS CORRECTED AS THEY OCCUR.

Supplemental Notes:

Vol 6, pp 188-191. Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the Transportation Research Board of the National Academy of Sciences. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved.

Monograph Accession #:

01488025

Authors:

Henderson, G H

Editors:

Upham, Charles M
Steinberg, S S

Publication Date:

1927

Serial:

Highway Research Board Proceedings

Volume: 6
Publisher: Highway Research Board

Media Type:

Digital/other

Uncontrolled Terms:

Old TRIS Terms:

Subject Areas:

Highways; Pavements

Files:

TRIS, TRB

Created Date:

Jun 11 1971 12:00AM

More Articles from this Serial Issue: