TRB Pubsindex
Text Size:

Mark: All | None | Show

Your Search
2007
Accelerated Full-Scale Testing of Geogrid-Reinforced Flexible Pavements

Transportation Research Board 86th Annual Meeting, 27p

Actions: Preview Abstract

2006-11
Vibration Measurement of Rail Stress

High-Speed Rail IDEA Program Project Final Report, 21p

Actions: Preview Abstract | View Full Document

2006-02
System to Detect Truck Hunting on Freight Railroads

Safety IDEA Program Project Final Report, 37p

Actions: Preview Abstract | View Full Document

2004-11
METAL FOAMS FOR IMPROVED CRASH ENERGY ABSORPTION IN PASSENGER EQUIPMENT

High-Speed Rail IDEA Program Project Final Report, 29 p.

Actions: Preview Abstract | View Full Document

2004-06
2004-02
CONTINUOUS LOCOMOTIVE EMISSIONS ANALYZER

High-Speed Rail IDEA Program Project Final Report, 32 p.

Actions: Preview Abstract | View Full Document

2004
SIGNIFICANT FINDINGS FROM FULL-SCALE ACCELERATED PAVEMENT TESTING

NCHRP Synthesis of Highway Practice, Issue 325, 211 p.

Actions: Preview Abstract | View Full Document

2003-08
INVESTIGATION OF A HYBRID-COMPOSITE BEAM SYSTEM

High-Speed Rail IDEA Program Project Final Report, 36 p.

Actions: Preview Abstract | View Full Document

2001-12
2001-12
INTEGRATED QUAD GATE CROSSING CONTROL SYSTEM

High-Speed Rail IDEA Program Project Final Report, 29 p.

Actions: Preview Abstract | View Full Document

2001-12
2001
2001
PILOT INSTALLATION OF A BRIDGE SCOUR MONITORING SITE

Transportation Research Record, Issue 1749, p. 68-72

Actions: Preview Abstract | View Full Document

2001
2001
W-BEAM GUARDRAIL ADJACENT TO A SLOPE

Transportation Research Record, Issue 1743, p. 80-87

Actions: Preview Abstract | View Full Document

to

Use YYYY or YYYYMM format

Modify | New Search | History